Owners: John Nimmo & Son.
The 'Dixie pits' (also seen as Dixey) were the
Nos. 2, 3 shafts of the Rosebank Colliery sunk in the late
19th century immediately to the east of the older 50 fathoms
deep Rosebank Pit, north of Rosebank Mains.
Rosebank No. 2 was sunk in 1881 to work the Under
Swallowdrum and 5 feet coals, and Rosebank No. 3 first
appears in the colliery records of 1882 working the Upper and
Lower Swallowdrum Coals. The No. 3 Pit lay just yards to the
north of the No. 2 Pit.
Click on Map to Zoom In
See West Fife entry for Rosebank Pits and Mines
for full information on coals worked at Rosebank
Colliery. |
| Rosebank
Nos. 2, 3 sinking: 1881/82 |
Rosebank Nos.
2, 3 closed: May 1918 |
| Source Date of
Information Supplied |
| Manager / Under-Manager /
Men underground / Men above ground / Coal seams
worked / Shaft Details |
| 1881 (John Nimmo & Son.)
No. 2 Pit |
Robert Grant /
-----------
Under Swallowdrum / 5 / 8* / D'cast (9½
x 4½) 69 ft. : U'cast (6½ x 4½) 72 ft.
5 feet / 19 / 8* / D'cast (4½ x 4½)
318 ft. : U'cast (6½ x 4½) 330 ft.
* 8 above ground workers in total for both seams. |
| 1882 No. 2 Pit |
| Robert Grant /
----------- / 5 feet / 22 / 4 / D'cast (14 x 4½)
318 ft. : U'cast (10 x 5) 132 ft. |
| No. 3 Pit |
Robert Grant /
-----------
Upper Swallowdrum / 16 / 4* / D'cast (9 x 6)
78 ft. : U'cast -----
Lower Swallowdrum / 5 / 4* / D'cast ----- :
U'cast -----
* 4 above ground workers in total for both seams. |
| 1883 |
| Mr. Robert
Grant, Manager - moving to Westburn Collieries, nr
Glasgow |
| 1890 |
| J. M. Hunter /
----------- / Five foot; Two foot; Splint / 62 / 5 /
D'cast (11 x 5) 330 ft. : U'cast (10 x 5) 192
ft. |
| 1914 |
April: Mr David
Birrell, manager. Mr John Clark, agent for Rosebank Colliery. |
| 1915 |
| May: Mr John Loudon,
manager. |
| 1918 |
| Rosebank
Nos. 2, 3: John Loundon / Alexander Hynd / 95 /
23 |
Information on coals worked at the Dixie
Nos. 2, 3 Pits, Rosebank
A number of abandonment plans for Rosebank Colliery (1918)
indicated the compositions of a number of coal seams wrought
at the Dixie Nos. 2, 3 Pits e.g. 2 feet, splint, five feet
and Swallowdrum, but since this information is already
adequately covered in the entry Rosebank Pits and Mines, it has not been
included here.
| Plans
of Abandoned Seams for Rosebank Nos. 2, 3 Pits
|
Pits or
Mines designated in Plans |
| COAL;
Upper Eight Feet; Lower Eight Feet; Upper Swallowdrum;
Lower Swallowdrum; Upper Silkstone; Lower Silkstone
(7 June, 1916) |
ROSEBANK Dixie Nos. 2, 3 Drumtuthil No. 1
|
| COAL; Two
Feet; Five Feet; Splint (14 May, 1918) |
ROSEBANK Dixie Nos. 2, 3
|
------------------------------------
"Dunfermline Saturday Press"
20 November, 1880
SEVERE ACCIDENT
On Wednesday forenoon, while William Cook, a waggon
driver, who was employed at the Dixey Pit, fully a mile north
of Dunfermline, was endeavouring to sprag a waggon, the
sprag gave way and struck him a severe blow on the face. He
was knocked down, and his injuries were so severe that he had
to be removed to the Edinburgh Royal Infirmary on
Thursday.
------------------------------------
"Dunfermline Saturday Press"
3 December, 1881
SERIOUS ACCIDENT TO A MINER
On Monday, while James McGregor, a miner, 21 years of age,
was engaged going along the workings of Dixey Pit, Rosebank
Colliery, with a lamp in his hand, for the purpose of
ascertaining if there was any fire-damp in the pit, he met
with a severe accident. He had only half traversed the
workings, when he placed the lamp in his hat - thus bringing
it within the region of the damp. It immediately exploded,
and burned him very severely about the face and hands. Mr.
McGregor is now recovering from his unfortunate accident.
------------------------------------
"Dunfermline Saturday Press"
21 February, 1891 EXPLOSION OF FIRE-DAMP AT
ROSEBANK COLLIERY
An explosion of fire-damp occurred on Saturday
morning in the Dixey Pit, Rosebank Colliery, near Dunfermline. A
mine inspector named Thomas Henderson had been examining the
workings when he perceived that fire-damp was in front of him, and
he had just turned back when an explosion occurred with the result
that he was severely scorched about the head, face, and arms.
Although his light was extinguished, Henderson got safely back to
the bottom of the shaft, and on reaching the surface was able to
walk home, where his injuries were attended to by the colliery
doctor.
------------------------------------
"Dunfermline Saturday Press"
27 April, 1895 PIT ACCIDENT
Mark Hutton, junior, nineteen years of age,
residing in Pittencrieff Street, Dunfermline, met with an accident
while working in No. 2 Pit, Rosebank Colliery, on Wednesday. He had
been pushing a hutch of coals from the platform on to the Wheel
Brae, and neglecting to attach the chain, the hutch started off.
Hutton retained his hold of the hutch, which struck against a prop
and then swung round, with the result that he was thrown against
the built-up wall. His forehead was severely cut, and his legs and
arms bruised. He was, however, able to walk home, where he was
attended by Dr Tuke. Hutton was afterwards removed to the
Dunfermline Cottage Hospital.
------------------------------------
"Dunfermline Saturday Press"
23 November, 1895 PIT ACCIDENT
There was an accident on Saturday at No. 2 Pit,
Rosebank Colliery. Alexander Fraser, hanger-on, Milesmark, was at
the bottom of the wheel brae when a run-away empty hutch came down
upon him, with the result that his left leg was broken below the
knee.
------------------------------------
"Dunfermline Press"
19 March, 1898
In the Dixey Pit, Rosebank Colliery, on Monday,
Archibald Byers, miner, Parkneuk, was drawing an empty hutch, when
a large piece of coal fell from the roof, striking the thumb of his
left hand, and bruising it so severely that, on his removal to the
Cottage Hospital, it had to be amputated.
------------------------------------
"Dunfermline Press"
21 July, 1900 DESTRUCTIVE FIRE AT ROSEBANK COLLIERY
Between eleven and twelve o'clock on Monday
night, fire broke out at the Dixie Pit, Rosebank Colliery,
Dunfermline, belonging to Messrs Nimmo & Sons, and a good deal
of havoc was wrought among the machinery and the pithead fittings
before the burning was extinguished.
The Dixie Pit is the down-cast shaft of the
colliery, and the Drumtuthil Pit, which is about a quarter of a
mile distant, is the up-cast shaft. The Dixie was well appointed,
having a pumping engine and winding engines situated on the north
side of the shaft, and a ventilating fan and engine, and a coal
washer, and all the fittings common to a modern pit on the other
sides. Work had been suspended at the pit on Thursday
of last week in connection with the annual holidays, and the only
men on duty on Monday night were Robert Moodie, engineman; John
Alexander, bricklayer; and Robert Grieve, joiner. Alexander and
Grieve were attending to some repairs at the boilers. It appears
that at about 11.15 fire was discovered to have broken out in the
oil store which adjoined the engine-houses, and the men lost no
time in giving the alarm. Unfortunately, Mr Clark, the manager, was
ill, but two of the oversmen and the joiner put in an early
appearance, and squads of men, who had heard of the burning and had
rushed to the pit, soon started to carry water from the ponds. The
Dunfermline Fire Brigade was also summoned by telephone. The
flames, fed by the oil in the store, made rapid progress, and in a
few minutes the engine-houses were ablaze. The Brigade arrived
about midnight. It seemed as if the whole pithead fittings were
doomed. The Brigade had several sets of hose fixed at the pond near
the pit, and were soon directing a large volume of water on the
burning pile. A squad of workers were started on the work of making
a diversion in the platform, so as to cut off the flames from one
of the sides of the pit, and thus save the coal-washing machine and
all its fittings and the ventilating fan. Happily the effort was
entirely successful. After six hours' continuous work the
flames were got under, and the fan and the washer were left
intact. The engine-houses were completely destroyed. The
winding engine and the pumping engine were in the very heart of the
burning, and the winding engine was completely wrecked. The drum
and the fly-wheel were rendered useless, and their fittings tangled
and twisted into every conceivable shape and the ropes destroyed.
The fire got among the pumping rods at the mouth of the mine, and
some damage was done in this connection. The uprights which formed
the standards for the pulley-wheels are standing, but they are so
much burnt that they will have to be taken down for
safety. The pumping engine did not suffer to the extent
expected - the damage being chiefly confined to rods which
connected the piston to the pumping gear at the mouth of the shaft.
New rods were introduced on Wednesday and the pump
re-started. One of the cages was at the bottom of the shaft
when the fire broke out, and the other was protected by iron rails
at the pit mouth when the flames began to spread in the direction
of the gearing which supported the pulley-wheels.
Being the holidays there were no men in the pit
when the fire broke out, but their ponies were stationed at a point
a little distance from the bottom of the shaft. Because of the fan
being stopped and the Dixie a down-cast shaft, it was feared that
the ponies would be choked by the fumes from the burning material.
On Tuesday, a squad of men descended the Drumtuthil Pit, and on
finding their way to the stables were surprised to find the ponies
alive. The air was not so strong as it was when the fan was at
work, but it was pure enough, and there was little evidence of
smoke - a fact which proved that the burning had not got hold of
the woodwork of the shaft. Steam connections with the boilers and the
ventilating fan were made on Tuesday night, and the fan was in full
working order on Wednesday, insuring a plentiful supply of air to
the other pits connected with the colliery. It is expected,
therefore, that the men affected by the fire will be provided with
employment in the adjoining pit.
A terrier bitch and six young puppies, which
were housed in the engine-room, perished in the flames, which
spread so rapidly that rescue was not possible. The bitch stuck to
the puppies, although the door was thrown open to provide a means
of escape.
------------------------------------
"Dunfermline Press"
28 July, 1900 DESTRUCTIVE FIRE AT ROSEBANK COLLIERY
A pair of coupled engines are to take the place
of the winding engine that was destroyed by fire at the Dixie Pit,
Dunfermline. A pithead frame of an improved type is also to be
erected.
-------------------------------------------------
"Dunfermline Press"
5 August, 1911 ROSEBANK PITS
The frame and fittings of the Wallsend Pit of Rosebank Colliery, Dunfermline, which
were destroyed by fire on the night of Coronation Day, have now been almost entirely
replaced, and it is expected that the pit will be ready for re-opening at the beginning of
next week. During the time the pit has been closed only a few of the 300 men who were
thrown idle were able to secure employment in the Company's other pit, and the
majority of the men have been out of work since the fire took place.
It is the intention of Messrs John Nimmo & Son, who own the colliery to re-open two
other pits in Rosebank. The Dixie Pit, which was shut down a number of years ago after
a fire had taken place, is to be modernised. It has been decided to widen the shaft
and to fit up pumping machinery in order to cope with the water, which flooded the
working in times of wet weather. A smaller pit which adjoins the Dixie is also to be
re-opened in order to comply with statutory requirements. That pit is only sunk to the
crop seam, and it is intended to deepen it until the Dunfermline splint coal is reached.
-------------------------------------------------
"Cowdenbeath & Lochgelly Times"
26 February, 1913 DUNFERMLINE PIT FLOODED
For some time past operations in the Dixie Pit, Rosebank Colliery, near Dunfermline,
have been seriously retarded by an accumulation of water, which the existing pumping
apparatus has been unable to satisfactorily cope with. Within the last few days the inrush
has been so great that it has been found necessary to withdraw the men engaged in the
lower seam. Messrs John Nimmo & Son, the lessees of the colliery, have been able
to find employment in their other pits for the majority of the men.
------------------------------------
"Dunfermline Press"
28 February, 1914
Alexander Hoggan, Castleblair Park, Dunfermline, had a narrow escape with his life on
Saturday at the Dixie Pit, Rosebank Colliery, where he is engaged as pitheadman. He was
caught by a descending cage which had moved off unexpectedly, and was pinned
between the ironwork of the cage and the gate. Noticing the incident, the engineman
rapidly applied the brakes to his engine, and brought the cage to a standstill. But for the
promptness with which the engineman acted, Hoggan would certainly have lost his life.
The injured man, suffering from a flesh wound about the chest, was conveyed home in
an ambulance waggon.
------------------------------------
"Dunfermline Press"
19 December, 1914 RE-OPENING OF ROSEBANK PITS.
After having been closed for two months, the Wallsend and Dixie Pits of Messrs John Nimmo & Son, Rosebank
Colliery, have been re-opened. During the temporary stoppage, the majority of the men found employment elsewhere.
There were several, however, to whom the closing of the pits caused extreme hardship.
------------------------------------
"Dunfermline Press"
27 March, 1915
A fatal accident took place in the Dixie Pit, Rosebank Colliery, Dunfermline, early on Thursday
morning, the victim being James Kerr (37), Stable Row, Milesmark, employed as a bottomer in the pit.
It is not known how the accident happened. The body was found lying in the cage seat, death
having taken place some time previously. It is supposed that Kerr was struck by a descending cage.
There was a severe wound on the back of the man's head, which would have been sufficient in
itself to cause death.
------------------------
"Dunfermline Press"
8 May, 1915
Under the Fatal Accidents Inquiry Act, an inquiry was held in the Sheriff Court, Dunfermline,
on Thursday - before Sheriff Umpherston and a Jury - into the circumstances attending the death of
James Kerr, pit bottomer, lately residing at Main Road, Milesmark, who died on 25 March in No. 3 pit,
Rosebank Colliery, by falling down the shaft from a cage in which he was ascending. Those giving
evidence included:- John Loudon, manager; James Binnie, winding engineman; John McEwan, pitheadman;
Ebenezer Campbell, fireman; Arthur Mosses, pit fireman; and John Clark, agent of Messrs Nimmo & Son.
The Sheriff remarked that there had been a breach of rule, and he thought the jury should express the
opinion that the accident was due to the use of the cage without the use of safety gates provided. The
jury returned a verdict to the effect suggested.
------------------------------------
"Dunfermline Press"
8 June, 1918 CLOSING OF DIXIE PIT
Consequent upon a great influx of water, Messrs John Nimmo & Sons, Ltd., have been under
the necessity of stopping operations at the Dixie Pit, the last of the pits at Rosebank Colliery to be
working. Altogether 120 men will be thrown temporarily out of employment.
------------------------------------
"The Scotsman"
28 June, 1918
IMPORTANT SALE of COLLIERY and ELECTRIC PLANT; 2 PAIRS COUPLED WINDING ENGINES,
10 in. LOCOMOTIVE; LANCASHIRE BOILERS; ELECTRIC PUMPS; COAL CUTTERS; SIROCCO VENTILATING
FAN; ELECTRIC CABLE and FITTINGS; Large Number STEEL BRIDGE RAILS; BRANCH RAILWAY; PERMANENT
SLEEPERS; CORRUGATED IRON; TIMBER, TOOLS, BUILDINGS, &c., at DIXIE PIT, ROSEBANK COLLIERIES,
DUNFERMLINE, on FRIDAY, 5th July 1918, at 11 o'clock prompt.
SHIRLAW, ALLAN, & CO., Auctioneers, Hamilton, have received instructions from Messrs John Nimmo &
Son, Limited, Coalmasters, owing to Termination of Lease, to Sell, by Auction, the Whole Plant, as follows:-
3 Lancashire Steam Boilers, 30 ft. and 28 ft. by 8 ft. and 7½ ft., by W. & J. Yates, Blackburn, and
Sinclair, Leith, insured at 100 lb.; 10 in, Saddle Tank Locomotive, by A. Barclay, Sons, & Co., Ltd., Kilmarnock,
built 1900, Copper Fire Box, Brass Tubes, insured at 120 lb.; Two Pairs 16 in. Coupled Winding Engines, with 7 ft.
Drums; The "Thomson" Patent Overwind Preventer, by The North British Steel Foundry, Ltd., Bathgate; 16 in.
Horz. Pumping Engine; 12 in. Horz. Driving Engine; 91 in. Sirocco Patent Ventilating Reversing Fan, by Davidson,
Belfast, capacity about 95,000 cub. ft. at 203 revs. per minute, coupled direct to 18 in. Vertical High-Speed Engine, by
Robey & Co., Ltd., Lincoln; Six Stage Electric Turbine Pump, by The British Electric Plant Co., Ltd., Alloa,
capacity about 506 gallons per minute at 430 ft. head, coupled direct to 115 H.P. Three-Phase Slip Ring Motor, volts
440, with Westinghouse Controller; Tow Six-Stage Electric Turbine Pumps, by the British Electric Plant Co., Ltd.,
capacity about 250 gallons per minute at 430 head, coupled direct to 65 H.P. Three-Phase Squirrel Cage Motor, volts
440, with Auto-Starter; 10 in. and 5 in. Tangye Special Steam Pumps; 30 Ton Waggon Weighing Machine, by
Pooley, built 1915, Table 14 ft.; 2-Ton Hand Bogie Crane, by Anderson, Carnoustie, 4 ft. 8½ in. gauge, 16 ft. jib;
about 3500 Yards Permanent Rails from about 80 lb. per yard; about 1550 Four-Hole Railway Chairs; about 1750
Two-Hole Railway Chairs; about 2000 Permanent Sleepers; 12 Sets Points and Crossings with 10 ft. to 8 ft. Blades,
for Permanent Rails, about 60 lb. per yard; about 90 Tons Steel Bridge Rails, 6 ft. long, about 14 lb. per yard, with
Crossings and Connections; about 300 C.I. Pit Plates, from 4 ft. by 2 ft.; Large Number C.L. Flanged Steam and Water
Pipes, from 12 in. to 4 in., with Valves and Connections; 2 Pithead Frames, 45 ft. high; 3 Pairs 8 ft. Pithead Spider
Pulleys, with Mingles; Pair 6 ft. C.L. Bell Cranks, with Connecting Rods, Radius Bars, Pump Rods, Foot Rods,
Plates and Connections; 16½ in. "Pick Quick" Enclosed Baby Bar Coal Cutter, by Mavor &
Coulson, Ltd., Glasgow; Three-Phase, 440 volts; 13½ in. "Pick Quick" Enclosed Midget Bar Coal
Cutter, by Mavor & Coulson, Ltd., Three-Phase, 440 volts; 200 Yards Three-Core 37/12 Double Armoured
Shaft Cable, 3¾ dia.; 607 Yards Three-Core 7/16 Double Armoured Cable; 3/20 Telephone Cable; 4 Coal
Cutter Braided Trailing Cables; Electric Cable, various; Three-Phase Distribution Panel; Three-Phase Switches
and Fuses; Gate-End Boxes; Joint Boxes; Transformers; Slate Switch Board for Low Tension Three-Phase,
440 volt circuit, by Anderson, Boyes, & Co., Ltd., with Connections; Earth Testing Panel, by Brash &
Russell, Glasgow, with Meters, Switches, and Connections; Ohmer Electric Testing Set (Cox' Patent);
Galvanometer; Electric Fittings, various; Shot Firing Batteries; Edney's Recording Mine Ventilation Gauge;
Anemometer; Colliery Barometer and Thermometer; F.E. Boiler Tank, 10 ft. by 7 ft. 3 in.; B.E. Heater, 9 ft. by 3 ft.;
Shaking Scree, 14 ft. by 4 ft., with Gear; Waggon Screes; Set Elevators, about 38½ ft. between centres;
Cages; 2½ Pairs Stephen Humble's Patent Detaching Hooks for 3-Ton Load; D.P. Pit Cranes; 108
Hutches; Hutch Tipplers; Cousie Wheels; Rope Pulleys; M.I. Water Kettles; 30 and 20 Cwt. Hutch Weighing
Machines; 6 Cwt. Platform Weighing Machine; 20 Cwt. 56 lb Weights; 5 in. and 4 in. Foot Turning Lathes;
Hand and Bench Vertical Drilling Machines; Smithy Bellows, Anvils, Vices, and Hand Shears; Engineer's
and Joiner's Tools; Platelayer's Bogie and Tools; Large Number Teale's Approved Safety
Lamps; New Brass Loco. Tubes, 7 ft. 8½ in. by 1¾ in.; Large Number Corrugated Iron Sheets;
Large Quantity Chain; Pony Pit Harness; Steel Wire Ropes, various; Large Quantity C.I., M.I., and Steel Scrap, &c.
Large Number Stores, including 14 Barrels, each containing about 40 Gallons Cylinder and Machinery Oil; Waggon
Springs and Mountings, Railway Keys, Bolts, Nuts and Nails, New Smithy Iron and Steel, 13 Rolls Brattice Cloth,
Hutch Timber, Parts of Hutches, Asbestos Joints, Insertion Cloth, Engine, Packing, &c.
Brick Buildings of Engine Houses and Workshops, with Corrugated Iron Roofs, and Steel Built Couples; Brick
Buildings, with Slate Roofs; Wooden Erections; Large Number Used Bricks and F.C. Circle Boiler Covers;
Bricks of Boiler Seats; Square Chimney Stalk, about 90 ft.; Timber of Pithead Sheds and Gangways, with
Corrugated Iron Roofs and Sides; Large Number New Round Pit props, from 10 ft. by 6 in. to 5 ft. by 4 in.;
Large Number Pit Sleepers; W.P. Planks and Battens; W.P. Lining, 6 in. by 7/8 in.; Firewood, &c.
N.B. - The Exposers will Load the Material on Railway Waggons Free of Charge.
Catalogues from Auctioneers.
Hamilton, June 1918.
------------------------------------

|