Dixie Nos. 2, 3 Pits, Rosebank, Dunfermline

Owners: John Nimmo & Son.

The 'Dixie pits' (also seen as Dixey) were the Nos. 2, 3 shafts of the Rosebank Colliery sunk in the late 19th century immediately to the east of the older 50 fathoms deep Rosebank Pit, north of Rosebank Mains.
Rosebank No. 2 was sunk in 1881 to work the Under Swallowdrum and 5 feet coals, and Rosebank No. 3 first appears in the colliery records of 1882 working the Upper and Lower Swallowdrum Coals. The No. 3 Pit lay just yards to the north of the No. 2 Pit.

Click on Map to Zoom In

See West Fife entry for Rosebank Pits and Mines
for full information on coals worked at Rosebank Colliery.


Rosebank Nos. 2, 3 sinking: 1881/82 Rosebank Nos. 2, 3 closed: May 1918
Source Date of Information Supplied
Manager / Under-Manager / Men underground / Men above ground / Coal seams worked / Shaft Details
1881 (John Nimmo & Son.) No. 2 Pit
Robert Grant / -----------
Under Swallowdrum / 5 / 8* / D'cast (9½ x 4½) 69 ft. : U'cast (6½ x 4½) 72 ft.
5 feet / 19 / 8* / D'cast (4½ x 4½) 318 ft. : U'cast (6½ x 4½) 330 ft.
* 8 above ground workers in total for both seams.
1882 No. 2 Pit
Robert Grant / ----------- / 5 feet / 22 / 4 / D'cast (14 x 4½) 318 ft. : U'cast (10 x 5) 132 ft.
No. 3 Pit
Robert Grant / -----------
Upper Swallowdrum / 16 / 4* / D'cast (9 x 6) 78 ft. : U'cast -----
Lower Swallowdrum / 5 / 4* / D'cast ----- : U'cast -----
* 4 above ground workers in total for both seams.
1883
Mr. Robert Grant, Manager - moving to Westburn Collieries, nr Glasgow
1890
J. M. Hunter / ----------- / Five foot; Two foot; Splint / 62 / 5 / D'cast (11 x 5) 330 ft. : U'cast (10 x 5) 192 ft.
1914
April: Mr David Birrell, manager.
Mr John Clark, agent for Rosebank Colliery.
1915
May: Mr John Loudon, manager.
1918
Rosebank Nos. 2, 3: John Loundon / Alexander Hynd / 95 / 23


Information on coals worked at the Dixie Nos. 2, 3 Pits, Rosebank

A number of abandonment plans for Rosebank Colliery (1918) indicated the compositions of a number of coal seams wrought at the Dixie Nos. 2, 3 Pits e.g. 2 feet, splint, five feet and Swallowdrum, but since this information is already adequately covered in the entry Rosebank Pits and Mines, it has not been included here.

Plans of Abandoned Seams for Rosebank Nos. 2, 3 Pits Pits or Mines designated in Plans
COAL; Upper Eight Feet; Lower Eight Feet; Upper Swallowdrum; Lower Swallowdrum; Upper Silkstone; Lower Silkstone (7 June, 1916) ROSEBANK
Dixie Nos. 2, 3

Drumtuthil No. 1
COAL; Two Feet; Five Feet; Splint (14 May, 1918) ROSEBANK
Dixie Nos. 2, 3

------------------------------------

"Dunfermline Saturday Press"
20 November, 1880
SEVERE ACCIDENT

On Wednesday forenoon, while William Cook, a waggon driver, who was employed at the Dixey Pit, fully a mile north of Dunfermline, was endeavouring to sprag a waggon, the sprag gave way and struck him a severe blow on the face. He was knocked down, and his injuries were so severe that he had to be removed to the Edinburgh Royal Infirmary on Thursday.

------------------------------------


"Dunfermline Saturday Press"
3 December, 1881
SERIOUS ACCIDENT TO A MINER

On Monday, while James McGregor, a miner, 21 years of age, was engaged going along the workings of Dixey Pit, Rosebank Colliery, with a lamp in his hand, for the purpose of ascertaining if there was any fire-damp in the pit, he met with a severe accident. He had only half traversed the workings, when he placed the lamp in his hat - thus bringing it within the region of the damp. It immediately exploded, and burned him very severely about the face and hands. Mr. McGregor is now recovering from his unfortunate accident.

------------------------------------

"Dunfermline Saturday Press"
21 February, 1891
EXPLOSION OF FIRE-DAMP AT ROSEBANK COLLIERY

An explosion of fire-damp occurred on Saturday morning in the Dixey Pit, Rosebank Colliery, near Dunfermline. A mine inspector named Thomas Henderson had been examining the workings when he perceived that fire-damp was in front of him, and he had just turned back when an explosion occurred with the result that he was severely scorched about the head, face, and arms. Although his light was extinguished, Henderson got safely back to the bottom of the shaft, and on reaching the surface was able to walk home, where his injuries were attended to by the colliery doctor.

------------------------------------

"Dunfermline Saturday Press"
27 April, 1895
PIT ACCIDENT

Mark Hutton, junior, nineteen years of age, residing in Pittencrieff Street, Dunfermline, met with an accident while working in No. 2 Pit, Rosebank Colliery, on Wednesday. He had been pushing a hutch of coals from the platform on to the Wheel Brae, and neglecting to attach the chain, the hutch started off. Hutton retained his hold of the hutch, which struck against a prop and then swung round, with the result that he was thrown against the built-up wall. His forehead was severely cut, and his legs and arms bruised. He was, however, able to walk home, where he was attended by Dr Tuke. Hutton was afterwards removed to the Dunfermline Cottage Hospital.

------------------------------------

"Dunfermline Saturday Press"
23 November, 1895
PIT ACCIDENT

There was an accident on Saturday at No. 2 Pit, Rosebank Colliery. Alexander Fraser, hanger-on, Milesmark, was at the bottom of the wheel brae when a run-away empty hutch came down upon him, with the result that his left leg was broken below the knee.

------------------------------------

"Dunfermline Press"
19 March, 1898

In the Dixey Pit, Rosebank Colliery, on Monday, Archibald Byers, miner, Parkneuk, was drawing an empty hutch, when a large piece of coal fell from the roof, striking the thumb of his left hand, and bruising it so severely that, on his removal to the Cottage Hospital, it had to be amputated.

------------------------------------

"Dunfermline Press"
21 July, 1900
DESTRUCTIVE FIRE AT ROSEBANK COLLIERY

Between eleven and twelve o'clock on Monday night, fire broke out at the Dixie Pit, Rosebank Colliery, Dunfermline, belonging to Messrs Nimmo & Sons, and a good deal of havoc was wrought among the machinery and the pithead fittings before the burning was extinguished.
The Dixie Pit is the down-cast shaft of the colliery, and the Drumtuthil Pit, which is about a quarter of a mile distant, is the up-cast shaft. The Dixie was well appointed, having a pumping engine and winding engines situated on the north side of the shaft, and a ventilating fan and engine, and a coal washer, and all the fittings common to a modern pit on the other sides.
Work had been suspended at the pit on Thursday of last week in connection with the annual holidays, and the only men on duty on Monday night were Robert Moodie, engineman; John Alexander, bricklayer; and Robert Grieve, joiner. Alexander and Grieve were attending to some repairs at the boilers. It appears that at about 11.15 fire was discovered to have broken out in the oil store which adjoined the engine-houses, and the men lost no time in giving the alarm. Unfortunately, Mr Clark, the manager, was ill, but two of the oversmen and the joiner put in an early appearance, and squads of men, who had heard of the burning and had rushed to the pit, soon started to carry water from the ponds. The Dunfermline Fire Brigade was also summoned by telephone. The flames, fed by the oil in the store, made rapid progress, and in a few minutes the engine-houses were ablaze. The Brigade arrived about midnight. It seemed as if the whole pithead fittings were doomed. The Brigade had several sets of hose fixed at the pond near the pit, and were soon directing a large volume of water on the burning pile. A squad of workers were started on the work of making a diversion in the platform, so as to cut off the flames from one of the sides of the pit, and thus save the coal-washing machine and all its fittings and the ventilating fan. Happily the effort was entirely successful. After six hours' continuous work the flames were got under, and the fan and the washer were left intact.
The engine-houses were completely destroyed. The winding engine and the pumping engine were in the very heart of the burning, and the winding engine was completely wrecked. The drum and the fly-wheel were rendered useless, and their fittings tangled and twisted into every conceivable shape and the ropes destroyed. The fire got among the pumping rods at the mouth of the mine, and some damage was done in this connection. The uprights which formed the standards for the pulley-wheels are standing, but they are so much burnt that they will have to be taken down for safety.
The pumping engine did not suffer to the extent expected - the damage being chiefly confined to rods which connected the piston to the pumping gear at the mouth of the shaft. New rods were introduced on Wednesday and the pump re-started.
One of the cages was at the bottom of the shaft when the fire broke out, and the other was protected by iron rails at the pit mouth when the flames began to spread in the direction of the gearing which supported the pulley-wheels.
Being the holidays there were no men in the pit when the fire broke out, but their ponies were stationed at a point a little distance from the bottom of the shaft. Because of the fan being stopped and the Dixie a down-cast shaft, it was feared that the ponies would be choked by the fumes from the burning material. On Tuesday, a squad of men descended the Drumtuthil Pit, and on finding their way to the stables were surprised to find the ponies alive. The air was not so strong as it was when the fan was at work, but it was pure enough, and there was little evidence of smoke - a fact which proved that the burning had not got hold of the woodwork of the shaft.
Steam connections with the boilers and the ventilating fan were made on Tuesday night, and the fan was in full working order on Wednesday, insuring a plentiful supply of air to the other pits connected with the colliery. It is expected, therefore, that the men affected by the fire will be provided with employment in the adjoining pit.
A terrier bitch and six young puppies, which were housed in the engine-room, perished in the flames, which spread so rapidly that rescue was not possible. The bitch stuck to the puppies, although the door was thrown open to provide a means of escape.

------------------------------------

"Dunfermline Press"
28 July, 1900
DESTRUCTIVE FIRE AT ROSEBANK COLLIERY

A pair of coupled engines are to take the place of the winding engine that was destroyed by fire at the Dixie Pit, Dunfermline. A pithead frame of an improved type is also to be erected.

-------------------------------------------------

"Dunfermline Press"
5 August, 1911
ROSEBANK PITS

The frame and fittings of the Wallsend Pit of Rosebank Colliery, Dunfermline, which were destroyed by fire on the night of Coronation Day, have now been almost entirely replaced, and it is expected that the pit will be ready for re-opening at the beginning of next week. During the time the pit has been closed only a few of the 300 men who were thrown idle were able to secure employment in the Company's other pit, and the majority of the men have been out of work since the fire took place.
It is the intention of Messrs John Nimmo & Son, who own the colliery to re-open two other pits in Rosebank. The Dixie Pit, which was shut down a number of years ago after a fire had taken place, is to be modernised. It has been decided to widen the shaft and to fit up pumping machinery in order to cope with the water, which flooded the working in times of wet weather. A smaller pit which adjoins the Dixie is also to be re-opened in order to comply with statutory requirements. That pit is only sunk to the crop seam, and it is intended to deepen it until the Dunfermline splint coal is reached.

-------------------------------------------------

"Cowdenbeath & Lochgelly Times"
26 February, 1913
DUNFERMLINE PIT FLOODED

For some time past operations in the Dixie Pit, Rosebank Colliery, near Dunfermline, have been seriously retarded by an accumulation of water, which the existing pumping apparatus has been unable to satisfactorily cope with. Within the last few days the inrush has been so great that it has been found necessary to withdraw the men engaged in the lower seam. Messrs John Nimmo & Son, the lessees of the colliery, have been able to find employment in their other pits for the majority of the men.

------------------------------------

"Dunfermline Press"
28 February, 1914

Alexander Hoggan, Castleblair Park, Dunfermline, had a narrow escape with his life on Saturday at the Dixie Pit, Rosebank Colliery, where he is engaged as pitheadman. He was caught by a descending cage which had moved off unexpectedly, and was pinned between the ironwork of the cage and the gate. Noticing the incident, the engineman rapidly applied the brakes to his engine, and brought the cage to a standstill. But for the promptness with which the engineman acted, Hoggan would certainly have lost his life. The injured man, suffering from a flesh wound about the chest, was conveyed home in an ambulance waggon.

------------------------------------

"Dunfermline Press"
19 December, 1914
RE-OPENING OF ROSEBANK PITS.

After having been closed for two months, the Wallsend and Dixie Pits of Messrs John Nimmo & Son, Rosebank Colliery, have been re-opened. During the temporary stoppage, the majority of the men found employment elsewhere. There were several, however, to whom the closing of the pits caused extreme hardship.

------------------------------------

"Dunfermline Press"
27 March, 1915

A fatal accident took place in the Dixie Pit, Rosebank Colliery, Dunfermline, early on Thursday morning, the victim being James Kerr (37), Stable Row, Milesmark, employed as a bottomer in the pit. It is not known how the accident happened. The body was found lying in the cage seat, death having taken place some time previously. It is supposed that Kerr was struck by a descending cage. There was a severe wound on the back of the man's head, which would have been sufficient in itself to cause death.

------------------------

"Dunfermline Press"
8 May, 1915

Under the Fatal Accidents Inquiry Act, an inquiry was held in the Sheriff Court, Dunfermline, on Thursday - before Sheriff Umpherston and a Jury - into the circumstances attending the death of James Kerr, pit bottomer, lately residing at Main Road, Milesmark, who died on 25 March in No. 3 pit, Rosebank Colliery, by falling down the shaft from a cage in which he was ascending. Those giving evidence included:- John Loudon, manager; James Binnie, winding engineman; John McEwan, pitheadman; Ebenezer Campbell, fireman; Arthur Mosses, pit fireman; and John Clark, agent of Messrs Nimmo & Son. The Sheriff remarked that there had been a breach of rule, and he thought the jury should express the opinion that the accident was due to the use of the cage without the use of safety gates provided. The jury returned a verdict to the effect suggested.

------------------------------------

"Dunfermline Press"
8 June, 1918
CLOSING OF DIXIE PIT

Consequent upon a great influx of water, Messrs John Nimmo & Sons, Ltd., have been under the necessity of stopping operations at the Dixie Pit, the last of the pits at Rosebank Colliery to be working. Altogether 120 men will be thrown temporarily out of employment.

------------------------------------

"The Scotsman"
28 June, 1918

IMPORTANT SALE of COLLIERY and ELECTRIC PLANT; 2 PAIRS COUPLED WINDING ENGINES, 10 in. LOCOMOTIVE; LANCASHIRE BOILERS; ELECTRIC PUMPS; COAL CUTTERS; SIROCCO VENTILATING FAN; ELECTRIC CABLE and FITTINGS; Large Number STEEL BRIDGE RAILS; BRANCH RAILWAY; PERMANENT SLEEPERS; CORRUGATED IRON; TIMBER, TOOLS, BUILDINGS, &c., at DIXIE PIT, ROSEBANK COLLIERIES, DUNFERMLINE, on FRIDAY, 5th July 1918, at 11 o'clock prompt.
SHIRLAW, ALLAN, & CO., Auctioneers, Hamilton, have received instructions from Messrs John Nimmo & Son, Limited, Coalmasters, owing to Termination of Lease, to Sell, by Auction, the Whole Plant, as follows:-

3 Lancashire Steam Boilers, 30 ft. and 28 ft. by 8 ft. and 7½ ft., by W. & J. Yates, Blackburn, and Sinclair, Leith, insured at 100 lb.; 10 in, Saddle Tank Locomotive, by A. Barclay, Sons, & Co., Ltd., Kilmarnock, built 1900, Copper Fire Box, Brass Tubes, insured at 120 lb.; Two Pairs 16 in. Coupled Winding Engines, with 7 ft. Drums; The "Thomson" Patent Overwind Preventer, by The North British Steel Foundry, Ltd., Bathgate; 16 in. Horz. Pumping Engine; 12 in. Horz. Driving Engine; 91 in. Sirocco Patent Ventilating Reversing Fan, by Davidson, Belfast, capacity about 95,000 cub. ft. at 203 revs. per minute, coupled direct to 18 in. Vertical High-Speed Engine, by Robey & Co., Ltd., Lincoln; Six Stage Electric Turbine Pump, by The British Electric Plant Co., Ltd., Alloa, capacity about 506 gallons per minute at 430 ft. head, coupled direct to 115 H.P. Three-Phase Slip Ring Motor, volts 440, with Westinghouse Controller; Tow Six-Stage Electric Turbine Pumps, by the British Electric Plant Co., Ltd., capacity about 250 gallons per minute at 430 head, coupled direct to 65 H.P. Three-Phase Squirrel Cage Motor, volts 440, with Auto-Starter; 10 in. and 5 in. Tangye Special Steam Pumps; 30 Ton Waggon Weighing Machine, by Pooley, built 1915, Table 14 ft.; 2-Ton Hand Bogie Crane, by Anderson, Carnoustie, 4 ft. 8½ in. gauge, 16 ft. jib; about 3500 Yards Permanent Rails from about 80 lb. per yard; about 1550 Four-Hole Railway Chairs; about 1750 Two-Hole Railway Chairs; about 2000 Permanent Sleepers; 12 Sets Points and Crossings with 10 ft. to 8 ft. Blades, for Permanent Rails, about 60 lb. per yard; about 90 Tons Steel Bridge Rails, 6 ft. long, about 14 lb. per yard, with Crossings and Connections; about 300 C.I. Pit Plates, from 4 ft. by 2 ft.; Large Number C.L. Flanged Steam and Water Pipes, from 12 in. to 4 in., with Valves and Connections; 2 Pithead Frames, 45 ft. high; 3 Pairs 8 ft. Pithead Spider Pulleys, with Mingles; Pair 6 ft. C.L. Bell Cranks, with Connecting Rods, Radius Bars, Pump Rods, Foot Rods, Plates and Connections; 16½ in. "Pick Quick" Enclosed Baby Bar Coal Cutter, by Mavor & Coulson, Ltd., Glasgow; Three-Phase, 440 volts; 13½ in. "Pick Quick" Enclosed Midget Bar Coal Cutter, by Mavor & Coulson, Ltd., Three-Phase, 440 volts; 200 Yards Three-Core 37/12 Double Armoured Shaft Cable, 3¾ dia.; 607 Yards Three-Core 7/16 Double Armoured Cable; 3/20 Telephone Cable; 4 Coal Cutter Braided Trailing Cables; Electric Cable, various; Three-Phase Distribution Panel; Three-Phase Switches and Fuses; Gate-End Boxes; Joint Boxes; Transformers; Slate Switch Board for Low Tension Three-Phase, 440 volt circuit, by Anderson, Boyes, & Co., Ltd., with Connections; Earth Testing Panel, by Brash & Russell, Glasgow, with Meters, Switches, and Connections; Ohmer Electric Testing Set (Cox' Patent); Galvanometer; Electric Fittings, various; Shot Firing Batteries; Edney's Recording Mine Ventilation Gauge; Anemometer; Colliery Barometer and Thermometer; F.E. Boiler Tank, 10 ft. by 7 ft. 3 in.; B.E. Heater, 9 ft. by 3 ft.; Shaking Scree, 14 ft. by 4 ft., with Gear; Waggon Screes; Set Elevators, about 38½ ft. between centres; Cages; 2½ Pairs Stephen Humble's Patent Detaching Hooks for 3-Ton Load; D.P. Pit Cranes; 108 Hutches; Hutch Tipplers; Cousie Wheels; Rope Pulleys; M.I. Water Kettles; 30 and 20 Cwt. Hutch Weighing Machines; 6 Cwt. Platform Weighing Machine; 20 Cwt. 56 lb Weights; 5 in. and 4 in. Foot Turning Lathes; Hand and Bench Vertical Drilling Machines; Smithy Bellows, Anvils, Vices, and Hand Shears; Engineer's and Joiner's Tools; Platelayer's Bogie and Tools; Large Number Teale's Approved Safety Lamps; New Brass Loco. Tubes, 7 ft. 8½ in. by 1¾ in.; Large Number Corrugated Iron Sheets; Large Quantity Chain; Pony Pit Harness; Steel Wire Ropes, various; Large Quantity C.I., M.I., and Steel Scrap, &c.
Large Number Stores, including 14 Barrels, each containing about 40 Gallons Cylinder and Machinery Oil; Waggon Springs and Mountings, Railway Keys, Bolts, Nuts and Nails, New Smithy Iron and Steel, 13 Rolls Brattice Cloth, Hutch Timber, Parts of Hutches, Asbestos Joints, Insertion Cloth, Engine, Packing, &c.
Brick Buildings of Engine Houses and Workshops, with Corrugated Iron Roofs, and Steel Built Couples; Brick Buildings, with Slate Roofs; Wooden Erections; Large Number Used Bricks and F.C. Circle Boiler Covers; Bricks of Boiler Seats; Square Chimney Stalk, about 90 ft.; Timber of Pithead Sheds and Gangways, with Corrugated Iron Roofs and Sides; Large Number New Round Pit props, from 10 ft. by 6 in. to 5 ft. by 4 in.; Large Number Pit Sleepers; W.P. Planks and Battens; W.P. Lining, 6 in. by 7/8 in.; Firewood, &c.
N.B. - The Exposers will Load the Material on Railway Waggons Free of Charge.
Catalogues from Auctioneers.
Hamilton, June 1918.

------------------------------------


Go Home